IT Services
Contract
Italy
Lughezzano
Needed
NCIA
EXPERIENCE AND EDUCATION:
Essential Qualifications/Experience:
· Bachelor’s degree in Electrical Engineering, Electronics, Telecommunications, or a related 5 years technical experience
· 5+ years of hands-on experience in power systems maintenance, troubleshooting
· Expertise in power distribution systems, UPS (Uninterruptible Power Supply) units, and generators
· Proficiency in monitoring and maintaining equipment such as rectifiers, inverters, and RF amplifiers, with working knowledge of remote telemetry and control systems
· Experience ensuring compliance with safety standards, preventive maintenance schedules, and technical documentation for classified or mission-critical operations
· Familiarity with DoD power system standards, STIG compliance for infrastructure components, and audit support for operational readiness
Desirable Qualifications/Experience:
· Local assignment language fluency
DUTIES/ROLE:
· Prime Power and Generators:
ü Maintain prime power systems (transformer vaults to distribution boards)
ü Operate and maintain diesel-electric generators, ensuring fuel supply and availability
ü Provide compliance inspections in accordance with CEI 64/08 prescriptions
· No-Break Power Systems:
ü Operate and maintain UPS, batteries, and emergency lighting
· Ancillary Systems:
ü Perform preventive maintenance on cross-site cabling, grounding, lightning protection, radomes, EMP pneumatic doors, and hydraulic systems
ü Provide basic maintenance of site security systems (gates, bollards, access infrastructure)
· Environmental Systems:
ü Provide maintenance of HVAC, heating, air handling units, and fire protection systems
ü Collaborate with industry providers for contracted services under Site Engineer oversight
· Support Activities:
ü Maintain accurate service records in TT-Comms, ITSM, and site logbooks
ü Provide monthly status reports on maintenance, incidents, and improvements
ü Support Site Engineers in planning, scheduling, and executing maintenance activities
|
SERVICE KPI and PENALTIES |
|||||
|
# |
Performance Objective |
Standard |
Performance Threshold |
PENALTY (if under performance threshold) |
Method of Report |
|
KPI01 |
Prime Power System Availability |
% of Completion |
99.9% of the measured period |
1% |
Monthly Report |
|
KPI02 |
Generator Availability |
% of Completion |
100% of critical updates |
1% |
Generator Maintenance report |
|
KPI03 |
Preventive Maintenance Completion |
% of Completion |
99.9% of the measured period |
1% |
Maintenance logs |
|
KPI04 |
Compliance with CEI 64/08 & Safety Standards |
% of Completion |
99.9% of the measured period |
1% |
Compliance docs |
|
KPI05 |
Incidents Resolution Report |
% of Completion |
99.9% of the measured period |
1% |
Corrective Action Reports from ITSM |
All the mandatory requirements have to be met in order to apply.